Defra has made some changes to the application form for a licence to burn heather and to the accompanying guidance.
Updates to application form
The maximum number of burns that can be manually added to the form has been increased from 25 to 200
A bulk upload option for proposed burns has been added, together with a supporting spreadsheet template.
Sections have been added to the form so that each section has a guidance page which provides an overview of the questions that will be asked in that section.
MA comment: The guidance recommends that if you are applying for more than 11 burns, you use the bulk upload spreadsheet.
Updates to guidance
A paragraph has been added to explain that applications should justify why alternative management methods (such as restoration, cutting, or grazing) are not feasible.
MA comment: this is a backwards step, as the 2025 Regulations had previously been amended to remove a requirement to show that other methods were not feasible.
A paragraph has been added to explain that research applications must be submitted by recognised academic institutions.
MA comment: this is too restrictive as many other types of organisation might legitimately wish to carry out burns for research purposes.
A bullet point has been added to explain that a map showing the landholding boundary and the location of the burn plots within this must be included.
The requirement for burn sites to be identified using an 8 figure grid reference has been amended to a 6 figure grid reference.
MA comment: the practicalities of mapping large moorland areas to show individual burn sites will be challenging, but the move from 8 figure to 6 figure grid references (representing a 100m x 100m square) is welcome
Additional information has been added to explain that applications within a Special Protection Area (SPA) or Special Area of Conservation (SAC) are likely to take longer than 12 weeks due to the additional assessments required.
MA comment: we need to explore this further with Defra as we estimate that SPAs and SACs cover more than 270,000ha of moorland area and any additional delay in granting licences is unhelpful.
What happens next
We are meeting this week with Defra’s Peat Protection Team, which manages the licensing process, and will discuss these updates with them. We will update MA members further in due course.